Sobha Amara Enquire Now

Location guide

GO 111 Kismatpur: Lake Rules, Repeal Status and What It Means

Sobha Kismatpur is now named Sobha Amara. Last verified: · Published:

GO 111 Kismatpur guide cover with the page title on a dark graphic about Himayat Sagar lake rules, Hyderabad
Illustration – not an actual project render

Kismatpur does not appear on any of the 3 published lists of the 84 villages under GO 111 that we checked. GO 111 itself still applies in September 2026. The KCR cabinet scrapped it in May 2023, but the new government put that repeal on hold in December 2023. A committee plan to ease the rules now waits for a cabinet vote.

What GO 111 said in 1996

On 8 March 1996, the government of undivided Andhra Pradesh issued GO 111. Its goal was to keep two drinking-water lakes clean. The lakes are Osman Sagar, finished in 1921, and Himayat Sagar, finished in 1927. The Nizam built both on the Musi after the 1908 flood.

The order drew a zone up to 10 km from the full tank level of each lake. It covered 84 villages and about 1.32 lakh acres. Those villages sit in the Shamshabad, Rajendranagar, Moinabad, Chevella and Shabad mandals.

GO 111 set three main limits:

  1. No polluting units. It barred industries, major hotels and large housing colonies that cause pollution.
  2. 90% stays green. About 90% of the zone was for conservation and recreation. Farms, orchards and gardens fit that use.
  3. Thin layouts. A housing layout had to leave 60% as open space and roads. Building plots got an FSI of 0.5.

An FSI of 0.5 means a 1,000 sq ft plot allows 500 sq ft of floor space. Compare that with the towers now rising near the ORR. Our master plan guide works out a built-up ratio near 12 for the reported Sobha Kismatpur plan.

The rule has a strong court record. On 1 December 2000, the Supreme Court ruled in the AP Pollution Control Board case. It backed the board’s refusal to let an oil unit set up within 10 km of the two lakes. The court said the burden of proof sits on the polluter. It also tied clean drinking water to the right to life.

Is Kismatpur inside the GO 111 zone?

We checked three public lists of the 84 villages. MyNesty posted one on 21 March 2025. YS Realty posted one on 29 August 2025. CommonFloor runs a third, with no date shown.

All three give the same Rajendranagar names. They are Khanpur, Gunugurthy, Vattinagulapalli, Mumera and Malakpur. CommonFloor shows the first four; the other two lists show all five. None of the three lists Kismatpur.

The lists also leave out Gandipet, Narsingi, Kokapet and Bandlaguda Jagir.

Watch for one name trap. The Moinabad part of the list includes a village called Himayat Nagar. It is not Himayat Sagar, and it is not Kismatpur.

Now the caveat. All three lists are secondary sources. We did not find the original 1996 annexure online, so we cannot quote it. Sources also describe the zone in two ways: a 10 km radius, and a list of 84 villages. Kismatpur sits about 2–5 km from Himayat Sagar, by the estimates on our location page. A lawyer should confirm how the radius and the list apply to any one survey number.

Reports say Sobha Kismatpur will have 2 towers of up to 56 floors. That plan would not fit GO 111’s 10% built-up rule. So the reported plan points to a site outside the zone. But Sobha has not published the survey number, so no one can check the plot yet.

GO 111 timeline, 1996 to 2026

The table sets out each step with its date and source. Where two sources disagree, we say so below the table.

DateWhat happenedSource
8 Mar 1996Andhra Pradesh issues GO 111 for 84 villagesDrishti IAS
1 Dec 2000Supreme Court backs the 10 km ban on a polluting unitIndian Kanoon
Apr 2022GO 69 lifts GO 111 limits and sets up a committeeDeccan Chronicle, 2023
16 Aug 2022High Court declines an interim stay on GO 69Telangana Today
Sep 2022State tells High Court the limits stay until the committee reportsSiasat, 2022
18 May 2023KCR cabinet scraps GO 111; HMDA rules to applySiasat, Telangana Today
16 Dec 2023CM Revanth Reddy puts the repeal on holdDeccan Chronicle
19 Jul 2024Telangana sets up HYDRAA to guard lakes up to the ORRWikipedia
2 May 2025High Court issues notices on 5 convention halls in JanwadaSiasat
Aug 2026High-power committee report heads to the cabinetHyderabad Mail, Deccan Chronicle

The repeal that did not stick

In April 2022, the state issued GO 69. It lifted the GO 111 limits on paper. It also set up a panel under the chief secretary to frame new rules. The panel drew in heads from urban planning, finance, irrigation, the water board, the pollution board and HMDA.

A petitioner filed a public interest case in the Telangana High Court. On 16 August 2022, Chief Justice Ujjal Bhuyan and Justice C V Bhasker Reddy heard it. They refused an interim stay and asked the state for its reply.

In September 2022, the state gave the court an assurance. The GO 111 limits would stay until the panel filed its report. A city official later told the Deccan Chronicle that no permits would go out until the state framed guidelines and zonal plans.

On 18 May 2023, the KCR cabinet scrapped GO 111 in full. It said the 84 villages would follow the same rules as land in GHMC limits. The state argued that Hyderabad now drinks from the Godavari, Krishna and Manjeera rivers. It promised sewage plants, ring mains and Kaleshwaram water to refill the lakes.

That repeal never took full effect. The Deccan Chronicle reported that the state did not give effect to a follow-up order, GO 63. On 16 December 2023, the new Chief Minister, Revanth Reddy, put the repeal on hold.

Where GO 111 stands in September 2026

The courts are still watching the zone. On 2 May 2025, a High Court bench issued notices on a new public interest case. Acting Chief Justice Sujoy Paul and Justice Renuka Yara sat on it. A Moinabad resident had flagged 5 convention halls in Janwada, each built for up to 5,000 guests.

The bigger news came in August 2026. Reports said a high-power committee report would go to the cabinet. The Chief Minister was abroad from 17 August to 10 September 2026. The cabinet was due to take it up after his return.

Sources differ on when the panel began. The Deccan Chronicle and Hyderabad Mail tie it to GO 69 in April 2022. The Telangana Tribune says the Congress government formed it in 2024. We give both and do not pick one.

Here is how the committee plan compares with the 1996 rules.

RuleGO 111 todayCommittee plan, Aug 2026
Built-up share10%40%
Green, roads and open space90% for conservation; 60% open in layouts60% for greenery, roads and open space
Where it startsAll 84 villagesAbout 8 villages inside the ORR first
IndustryPolluting units barredRed and orange category units still barred
SewageNo set systemDiversion pipes; zero liquid discharge for villas, resorts and shops
Zone map10 km radius and village listSatellite map of true catchment and non-catchment land

As of 26 September 2026, we found no report of a cabinet decision. A Propnewz guide from mid-2026 says the limits remain in force. So today, GO 111 still binds its 84 villages. We will update this page when the cabinet acts.

Lake buffer rules: FTL and the 30 m line

GO 111 is not the only lake rule. A second set applies across Hyderabad, inside or outside the 84 villages. It starts with the full tank level, or FTL. The FTL is the highest line the water of a lake can reach.

Hyderabad’s 2012 building rules, GO 168 of 7 April 2012, set a no-build buffer beyond that line. The width depends on the size of the water body.

Water bodyNo-build buffer
River, inside city limits50 m
Lake or tank of 10 ha or more30 m from FTL
Lake or tank under 10 ha9 m from FTL
Canal or nala wider than 10 m9 m
Canal or nala up to 10 m wide2 m

Himayat Sagar covers about 19.68 sq km, per Wikipedia. That is close to 1,968 hectares, so the 30 m rule applies.

Since 19 July 2024, HYDRAA has enforced these lines. The state formed it under GO 99. Its reach covers the core city up to the ORR, which takes in Kismatpur. It can remove structures from lakes and buffer strips with the help of HMDA, irrigation and revenue staff.

The key point for a buyer: a plot can sit outside GO 111 and still touch a buffer. Small tanks, kuntas and nalas carry their own 9 m or 2 m lines. The lake maps lay these lines over revenue survey numbers, so the survey number decides the answer.

What this means for a Sobha Kismatpur buyer

Sobha has not published the site survey number, map pin or boundary. Its TG RERA filing is still awaited. So no one can yet say how GO 111 or any buffer line touches the 5.21-acre plot. Our RERA tracker will flag the day the filing goes live.

Until then, use these five checks. Ask for each answer in writing.

CheckWhere to lookWhy it matters
Village and survey numberSale papers; TG RERA filingMatch it against the 84-village list
FTL and buffer linesHMDA and HYDRAA lake mapsShows any 30 m, 9 m or 2 m line on the plot
Building permit and heightTG RERA filingConfirms the approved floors and built-up area
Title opinionYour own lawyerChecks the land record and any court case
Bank approvalLenders named at launchPropnewz notes loans are hard to get on GO 111 land

Now think about price. If the cabinet eases GO 111, more land south and west of the lakes could open up. That could add new supply near Kismatpur. It could also bring roads and sewers to the area. We do not forecast which effect wins, and no one can promise either. Our price guide tracks the rates that matter today.

This page sums up public reports as of 26 September 2026. It is not legal advice. Check any plot with a lawyer before you pay. For the rest of the project facts, see the launch and RERA status on our main guide.

Sobha Amara (Sobha Kismatpur): frequently asked questions

Is Kismatpur under GO 111?

Kismatpur does not appear on the three published lists of the 84 GO 111 villages we checked in September 2026. The Rajendranagar villages on those lists are Khanpur, Gunugurthy, Vattinagulapalli, Mumera and Malakpur. Confirm any single survey number with a lawyer and HMDA.

Is GO 111 cancelled?

No. The KCR cabinet scrapped it on 18 May 2023, but Chief Minister Revanth Reddy put that repeal on hold in December 2023. Reports from June and August 2026 say the rules still apply.

What is the latest news on GO 111?

In August 2026, a high-power committee report went up to the Telangana cabinet. It proposes raising the built-up share from 10% to 40% and starting with about 8 villages inside the ORR. We found no cabinet decision as of 26 September 2026.

What is the buffer zone around Himayat Sagar?

Under GO 168 of 2012, a lake of 10 hectares or more needs a 30 m no-build buffer from its full tank level. Himayat Sagar covers about 19.68 sq km, so the 30 m rule applies.

What was allowed under GO 111?

GO 111 kept about 90% of the zone for conservation and recreation, such as farms and gardens. Layouts had to leave 60% as open space and roads, with an FSI of 0.5. Polluting industries, major hotels and large colonies were barred.

How do I check if a plot is in a lake buffer zone?

Get the survey number and village from the sale papers. Then check it against the HMDA and HYDRAA lake maps, which lay FTL and buffer lines over revenue survey numbers. A lawyer should confirm the result in writing.

Get the Sobha Kismatpur cost sheet and floor plans

We send the official documents the day Sobha Limited releases them. No charge, no spam.

Request received

Thank you — we'll reach out shortly with the details.

Get Price & Brochure
Sobha Amara
Enquire Now

Sobha Kismatpur Assistant

Typically replies instantly